Our crew will arrive at your home the day of installation. They will tarp off all the bushes and plants to ensure they are not damaged. They will then tear-off all existing shingles & felt paper. Once everything is off the roof any rotted wood will be replaced. The next step is to lay felt paper throughout the entire roof. Finally, shingles will go on. The ridge is cut appropriately, and ridge vent installed. The last step is to caulk all roof penetrations and to walk to dwelling to ensure nothing was missed. At that point, a thorough cleaning of the premises is completed.
The day following your installation, a separate cleaning crew will come to check behind the installation crew to ensure that everything is cleaned properly. In most cases, we will finish a house in 1 day, but please block off 2 days to be sure that we can do our work properly, and with great attention to detail.
If there is inclement weather leading up to your roof installation, our entire schedule must move. However many days we lose to rain between the time that your roof is put on our installation schedule and the day that it is actually scheduled for is how many days your installation will be pushed back.
It takes time for the adhesive strips on the undersides of the shingles to adhere permanently, allowing the shingles to lay flat. This takes several weeks in the summer with the 90 degree heat and in the winter it can take anywhere from 4-8 weeks.
All Rights Reserved | Carolina Roof Consultants